jueves, 25 de marzo de 2010

Website for the degree show

As part of my contribution for the show, I developed the website which will hold the information on our show; our profiles, short-films and so on. I think it is a good start to keep things going towards the end of year show.
The Website desing was done on Microsoft Expression Web 2.

Check it out at: http://www.littleeye.co.uk/

Further information will be added soon, as soon as we all finish our short films they will be uploaded on Vimeo to then be linked to the Little Eye website.

martes, 9 de marzo de 2010

Production of Fortune completed

The production of Fortune has been completed on the 4th and 5th of March as planned. I will be including production material soon. The filming took from 9am till 5:30pm on both days, at the TV studio and the flat location on thursday and friday respectively. Thanks to the help of my Assistant director (Navarro Aydemir) the shot list for the Poker scene was simplified in a way that allowed us to shoot the whole scene in the day. Dolly shots where removed and replaced by mostly OTS shots of both characters.
I'll begin with post production in a couple of weeks, this way I'll have time to clarify my mind and come up with new ideas for the structure of the film.

Here are some stills taken from the actual footage of the film:






Here there are some production pictures at the flat location: